Overhaul

LRT BREAKDOWN ARE DUE TO AFTERTHOUGHTS AND POLITICAL PRESSURE, WHAT ABOUT MRT BREAKDOWNS?

Bukit Panjang’s LRT system is now due to be overhauled after logging hundreds of operational mishaps since its introduction. The list runs the gamut from track faults and dislodged wheels to doors opening while in transit and trains either breaking down, stalling or failing to stop.

In some cases, commuters have even had to walk along raised outdoor tracks, although severe delays and disruptions have been a more common issue.

Filed Under: 

KHAW: BUKIT PANJANG LRT BUILT DUE TO POLITICAL PRESSURE, ITS BAD DESIGN MAKES ME DIZZY

Our beloved Minister for Transport Khaw Boon Wan divulged that the Bukit Panjang LRT system, which has been dogged with problems, was actually built due to political pressure. He insists, however, on upgrading it as the design is bad and makes him dizzy.

Filed Under: 

Pages

Advertisement
Subscribe to RSS - Overhaul