NEW EXTENSION OF DOWNTOWN LINE TO BE RIGOROUSLY TESTED BEFORE OPENING, BREAKDOWNS UNACCEPTABLE

Dear A.S.S. Editor

Advertisement

The Downtown Line trains are now ready for critical testing of the new extension of the line, and trains from existing stations on the line will start later on Sundays from April to August.

With this extensive testing, and with the line expected to fully open by the end of the year, let's hope this line does not suffer the same amount of breakdown as its predecessors on the other lines.

For a new MRT line, it does not make sense for it to suffer breakdowns so soon after the opening. If it does, then it hints at a poorly planned and built system, and authorities will be hard pressed to explain this off as an old line that needs repairs after years of use. This is a brand new MRT line, breakdowns should not be an issue.

John Wong

A.S.S. Contributor

Editor's Note: 

Do you have a story to share? Please use our submission form or email us at editorial@allsingaporestuff.com. If not, why not give us a 'Like'?

Filed Under: 

Tags: 

Advertisement

Your Views