AFTER YEARS OF BREAKDOWNS, SMRT STILL STRUGGLES TO SOLVE PROBLEMS PLAGUING NORTH-SOUTH LINE?

SMRT is struggling to pinpoint and rectify the cause of the signalling fault that is continuing to beset the NS Line. The hopeless PTO has posted two Twitter updates notifying commuters to “plan ahead” due to “longer traveling time.”

[NSL]: Our engineers are working hard to continue their checks and investigations. Our staff is ready to assist.

[NSL]: If you intend to travel on the North-South Line later, pls plan ahead. You may experience longer train travel time.

Check Also

Taxi Driver Go From Botak To Bruised After Getting Scratched By Drunk Woman

The two women didn't even run away. They ended up on the roadside while bystanders photographed them in their intoxicated state.