NEW TEMPORARY RD TO CONNECT PUNGGOL EAST TO KPE THIS SAT

The Land Transport Authority has informed that a temporary road that connects Punggol East to the KPE will open this Saturday at 3 p.m. (26 Mar 2016).

This new road is single-lane and it spans across Sungei Serangoon. The temporary road will only serve vehicles with a height of up to 2.4 metres and an unladen weight of 2,500kg. This will provide motorists from the area with a more direct link to KPE.

Check Also

Violent Neighbour Attacked Man With Bicycle Chain for Blocking His Way!

The crazy neighbour was unhappy that he blocked the way and struck him with a bicycle chain and padlock. What is our society becoming?